Dual-Head Shuttle Conveyor PTK-D300
Two transfer heads working simultaneously — double the throughput for high-volume parallel SMT line configurations at Tier-1 EMS factories.
| Model | PTK-D300 |
| Configuration | Dual head (2 simultaneous transfers) |
| Dimensions | L600 × W3500 × H1050 mm |
| Weight | 550 kg |
| Interface | SMEMA compatible |
Full Specifications
| Model | PTK-D300 |
| Configuration | Dual head (2 simultaneous transfers) |
| Machine Dimensions | L600 × W3500 × H1050 mm |
| Machine Weight | 550 kg |
| Conveyor Height | 900 ± 20 mm (SMEMA standard) |
| Interface | SMEMA compatible |
| Power Supply | 220V / 50Hz |
Who Should Choose the Dual-Head Shuttle?
Tier-1 EMS High-Volume Factories
Large-scale manufacturers where the transfer rate between lines is the bottleneck. Two boards move simultaneously for double throughput.
3+ Parallel Line Configurations
Factories with three or more parallel SMT lines that need rapid distribution across all lines from a central entry point.
Zero Idle Time Requirements
Production environments where even brief delays at the shuttle are unacceptable — dual heads eliminate alternating wait times.
Compared to Single-Head
The PTK-D300 is wider (W3500mm vs W1500mm) but transfers two boards at once. Choose dual-head when transfer throughput is a bottleneck.
Maximise Your Multi-Line Throughput
Get a layout consultation to configure dual-head shuttle placement across your parallel SMT lines.
Request a Quote