Dual-Head Shuttle Conveyor PTK-D300 | High-Speed Line Transfer | S&M

Dual-Head Shuttle Conveyor PTK-D300 – high-speed parallel line transfer
Shuttle Conveyor · Model PTK-D300

Dual-Head Shuttle Conveyor PTK-D300

Two transfer heads working simultaneously — double the throughput for high-volume parallel SMT line configurations at Tier-1 EMS factories.

ModelPTK-D300
ConfigurationDual head (2 simultaneous transfers)
DimensionsL600 × W3500 × H1050 mm
Weight550 kg
InterfaceSMEMA compatible
Request a Quote Full Specs

Full Specifications

ModelPTK-D300
ConfigurationDual head (2 simultaneous transfers)
Machine DimensionsL600 × W3500 × H1050 mm
Machine Weight550 kg
Conveyor Height900 ± 20 mm (SMEMA standard)
InterfaceSMEMA compatible
Power Supply220V / 50Hz

Who Should Choose the Dual-Head Shuttle?

Tier-1 EMS High-Volume Factories

Large-scale manufacturers where the transfer rate between lines is the bottleneck. Two boards move simultaneously for double throughput.

3+ Parallel Line Configurations

Factories with three or more parallel SMT lines that need rapid distribution across all lines from a central entry point.

Zero Idle Time Requirements

Production environments where even brief delays at the shuttle are unacceptable — dual heads eliminate alternating wait times.

Compared to Single-Head

The PTK-D300 is wider (W3500mm vs W1500mm) but transfers two boards at once. Choose dual-head when transfer throughput is a bottleneck.

Maximise Your Multi-Line Throughput

Get a layout consultation to configure dual-head shuttle placement across your parallel SMT lines.

Request a Quote
Scroll to Top